Answer:
a. (15, 15)
Step-by-step explanation:
We start with those two equations:
1) a - 1.2b = -3
2) 0.2b + 0.6a = 12
We'll begin by modifying equation #1 to isolate a:
a = -3 + 1.2b
Then we'll use this value for a in the second equation:
0.2b + 0.6 (-3 + 1.2b) = 12
0.2b - 1.8 + 0.72b = 12
0.92b = 13.8
b = 15
Then we'll place that value of b in the first equation to find a:
a - 1.2 (15) = -3
a - 18 = -3
a = 15
Answer:
Points C,D, E and F are coplanar.
1 3/7 ~ One and three sevenths
Answer:
i did a wild guess and i got the answer is 2
Step-by-step explanation:
2*7=14
14-4=10
10-2=8
Given:
μ = $3.26 million, averaged salary
σ = $1.2 million, standard deviation
n = 100, sample size.
Let x = random test value
We want to determine P(x>4).
Calculate z-score.
z = (x - μ)/ (σ/√n) = (4 - 3.26)/(1.2/10) = 6.1667
From standard tables,
P(z<6.1667) = 1
The area under the distribution curve = 1.
Therefore
P(z>6.1667) = 1 - P(z<=6.1667) = 1 - 1 = 0
Answer: The probability is 0.