Answer:
3.25 in one hour
Step-by-step explanation:
6.5 ÷ 2 = 3.25
Answer:
r = 0.9
Step-by-step explanation:
Correlation is denoted by r. r² is usually used to measure variation along the line as a fraction of the total variation.
We are told class attendance explained 81% of the variation in grade index among the students. Thus, for this regression, the variation is;
r² = 81%
Or r² = 0.81
Thus, the numerical value of the correlation r would be;
r = √0.81
r = 0.9
For the left-hand triangle we know:

.
Solving for

we have:



So the angles on the left are: 47,31 and 102 degrees.
On the right we have

Substituting known values and solving we get:

[tex]y=72\°[/tex}
So the angles on the right are, 72, 61 and 47 degrees.
Answer:
y=![-\frac{\sqrt[3]{63} }{3}](https://tex.z-dn.net/?f=-%5Cfrac%7B%5Csqrt%5B3%5D%7B63%7D%20%7D%7B3%7D)
y=0
Step-by-step explanation:
−
4
(
3
+
7
)
-4
=0,
(
3
+
7
)=0
=0 3
=-7
y=0
=
y=![-\frac{\sqrt[3]{63} }{3}](https://tex.z-dn.net/?f=-%5Cfrac%7B%5Csqrt%5B3%5D%7B63%7D%20%7D%7B3%7D)
Answer:
It would take them 6.667 minutes to paint 50 square feet together.
Step-by-step explanation:
This is a classic work problem. If Sam can do the job in 10 minutes, she can get done 1/10 of the job in one minute. If you can do the job in 5 minutes, you can 1/5 of the job done in one minute. To find out how many minutes it will take them together to paint 25 square feet, set the addition of their times equal to 1/x:

x is how long it takes them to get the job done together. Find the common denominator and multiply it through be everything to get rid of the denominators altogether. That denominator is 10x:

Simplify to get the simple equation x + 2x = 10 and 3x = 10. That means that x=3 1/3. That's how long it takes to do 25 square feet. Double that time for 50 square feet.