1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Aleonysh [2.5K]
3 years ago
7

How does the value of b affect the graph of y= mx+b?

Mathematics
2 answers:
Virty [35]3 years ago
8 0

Answer:

I think it moves it up on the y axis

goldfiish [28.3K]3 years ago
6 0

Answer:

the "b" is the y-intercept. The value of b affects the graph greatly. If the b is positive then the graph would be angled to the right and if it were negative it would be angled to the left.

Hope that helped :)!

Step-by-step explanation:

You might be interested in
Given f(x) = x^2- 3x + 5, what is f(-2)?
vlabodo [156]

Step-by-step explanation:

f(x) = x² - 3x + 5

f(-2) = (-2)² - 3.(-2) + 5

f(-2) = 4 + 6 + 5

f(-2) = 15

7 0
10 months ago
Read 2 more answers
Need answers please !!!!
kow [346]

inital height is 2 meters

Step-by-step explanation:

5 0
3 years ago
On a certain day, the temperature changed at a rate of -2O per hour. How long did it take for the change in temperature to be -1
topjm [15]

Answer:

it took 7 hours

Step-by-step explanation:

7 0
2 years ago
HELP PLEASE!<br><br><br> What is the coefficient of the term of degree 4 in this polynomial below?
Eddi Din [679]

Answer:

2

Step-by-step explanation:

The term of degree 4 is the term with the exponent of 4

2x^4

The coefficient is the number out in front

2x^4 has a coefficient of 2

8 0
3 years ago
Read 2 more answers
Three experts gave opinions on how long a task will take to finish. The estimates were 29, 10, and 12 days (in no particular ord
nirvana33 [79]

Answer:

15

Step-by-step explanation:

PERT estimate is a measuring strategy that is based on a weighted average. It is used in measuring the uncertainty and risk via three estimates to determine an estimated likelihood for a project's cost or period of completion.

The formula is (O + 4M + P) ÷ 6

Where P is the most pessimistic = 29

M is the most likely = 12

O is the most optimistic = 10

Hence we have (10 + [4*12]+ 29) ÷ 6

= (10 + 48 + 29) ÷ 6

= 87÷6 = 14.5 ≈ 15

Rounded figure is equal to 15.

Hence the final answer to the question is 15

7 0
2 years ago
Other questions:
  • I need help on all of these plz
    10·1 answer
  • Help me please !!!!!!!!!!!!!!!!!!!
    9·1 answer
  • Triangle RST was dilated with the origin as the center of dilation to create triangle
    15·1 answer
  • Find the slope of the line using (4,-4) (8,-1) (0,-7) (-4,-10)
    11·2 answers
  • For and event i made 72 dessert plates, each containing the same number of pastries. I didn't need that many plates so i removed
    15·1 answer
  • The population of a city is represented by the function p(t)=33,500(1.014)^t where t represents time in years and corresponds to
    13·1 answer
  • Which expression represents 3 more than 2x
    14·1 answer
  • Find the distance of segment RS with endpoints R(4.4) and S(-1,-1)
    11·1 answer
  • The playing surfaces of two foosball tables are similar. The ratio of the corresponding side lengths is 10 : 7. What is the rati
    5·1 answer
  • Which polynomials are in standard form?
    8·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!