Juan rode the slowest. It took him 5 minutes to go 2 blocks and another 3 minutes to go 2 more blocks. It was taking him longer minutes to go 2 blocks at a time. Took Juan 17 minutes to do 8 blocks and Rita did 8 blocks in 8 minutes she was faster. Hope this helps
Answer:
10 employees because 2015 had 45 employees and 2017 had 55 employees. 45 + 55 = 10
The correct answer might be A
Answer:
(12, -6)
General Formulas and Concepts:
<u>Pre-Algebra</u>
Order of Operations: BPEMDAS
- Brackets
- Parenthesis
- Exponents
- Multiplication
- Division
- Addition
- Subtraction
Equality Properties
- Multiplication Property of Equality
- Division Property of Equality
- Addition Property of Equality
- Subtraction Property of Equality<u>
</u>
<u>Algebra I</u>
- Terms/Coefficients
- Coordinates (x, y)
- Solving systems of equations using substitution/elimination
Step-by-step explanation:
<u>Step 1: Define Systems</u>
-4x = y - 42
x = 18 + y
<u>Step 2: Solve for </u><em><u>y</u></em>
- Substitute in <em>x</em>: -4(18 + y) = y - 42
- Distribute -4: -72 - 4y = y - 42
- [Addition Property of Equality] Add 4y on both sides: -72 = 5y - 42
- [Addition Property of Equality] Add 42 on both sides: -30 = 5y
- [Division Property of Equality] Divide 5 on both sides: -6 = y
- Rewrite/Rearrange: y = -6
<u>Step 3: Solve for </u><em><u>x</u></em>
- Define original equation: x = 18 + y
- Substitute in <em>y</em>: x = 18 - 6
- Subtract: x = 12
To figure this out, you must use the Pythagorean theorem.
That is were you take the width of the opject, and square it (21 squared). and take the length of the object and square it (28 squared),
then add those together. (21 squared + 28 squared) = NUMBER
then take that number that you got, and find the square root of it. (<span>√NUMBER)
and that's your answer.
So it would be: 35 meters</span>