Answer:
1 hour and 7.5 minutes
Step-by-step explanation:
We have the following information:
Jose makes 1 / 1.5 of the job per hour. It is his rate of work in addition to that the partner makes 1 / 4.5 of the job per hour. It is his rate of work.
Thus:
1 / 1.5 + 1 / 4.5 = 1 / x
0.8898 = 1 / x
x = 1 / 0.8888
x = 1.125
Hence, it will take 1 hour and 7.5 minutes for them to complete the job working together.
Answer:
2.8 if rounded, If not rounded, 2.77
Answer:






Step-by-step explanation:
To add or subtract you need to make the denominator the same. To do this you need to find the least common multiple.
Given that the line passes through the two points (-3,4) and (2,8)
We need to determine the equation of the line.
<u>Slope:</u>
The slope of the line can be determined using the formula,

Substituting the points (-3,4) and (2,8) in the above formula, we get;


Thus, the slope of the line is 
<u>Equation of the line:</u>
The equation of the line can be determined using the formula,

Substituting the point (-3,4) and
in the above formula, we have;




Thus, the equation of the line is 