Answer:
8.5 hrs
Step-by-step explanation:
-A 75th percentile mathematically means that 75% of the time data points are below that value and 25% of the time are above that value.
-We plot the given our data {3 12 2 3 5} to determine the 75th percentile
#We can use
to plot our boxplot.
-From the plot, we find our 75th percentile to be 8.5 hrs
Hence, 75% of the time the number of hours spent to prepare was less than 8.5hrs.
Answer:
12 inches of fabric
Step-by-step explanation:
Area of a triangle = hight x base
so 6 x 2 = 12
12 inches of fabric is your answer
Hope this helps :)
Answer: None. The question asks about $4 per hour.
Step-by-step explanation: The cost changes by $4 every 2 hours.
That is $2 per hour.
ANSWER
Option B
and
Option D.
EXPLANATION
The graph of the function has an amplitude of 2 and a period of

Choose all the equation that has an amplitude of 2 and a period of

These are:

and

The second and the last options are correct.
Answer:
2 and 2/3
Step-by-step explanation:
(2/3)x(2/3)x6=
2 and 2/3