1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
gayaneshka [121]
3 years ago
12

What 3 numbers can you multiply to get 160?

Mathematics
2 answers:
timama [110]3 years ago
3 0
Three numbers you can multiply to get 160. First, we make an equation.

Since 160 is divisible by 4, we will make the equation this.

(#1 * #2 * 4 = 160)
 Divide 160 by 4, and you get this. #1 * #2 = 40

Now, we divide 40 by 2. 

The final answer is 2, 20, and 4.

2x20x4= 160
Romashka-Z-Leto [24]3 years ago
3 0
You can multiply... 
<span>8 * 20 = 160
40 * 4 = 160
80 * 2 = 160
<span>10 * 16 = 160</span></span>
You might be interested in
A line passes through the point (8, -9) and has a slope of 3/4 . Write an equation in point-slope form for this line.​
Finger [1]

Answer:

y+9=3/4(x-8)

Step-by-step explanation:

y-y1=m(x-x1)

y-(-9)=3/4(x-8)

y+9=3/4(x-8)

6 0
2 years ago
Please help I have no clue how to do this​
Alinara [238K]

Step-by-step explanation:

It's a question of trigonometry.

You need to remember that tangent (tan) stands for Perpendicular / Base.

So, tan P = QR / PR

By Pythagoras Theorem,

34² = 30² + x²

x² = 34² - 30²

x² = 1156 - 900

x² = 256

x = 16

Now, placing the values,

tan P = 30 / 16

tan P = 1.875

HOPE IT HELPS ^_^

5 0
2 years ago
5(2+(-9))+-25<br> HELP<br> PLZZ
Gelneren [198K]
Answer: -60

Step by step
5 (2 - 9) -25
Start by distributing which will give you
10 - 45 - 25
Combine your like terms giving you
-60
7 0
2 years ago
Read 2 more answers
A company manufactures two different sizes of boat lifts. The smaller lift requires 1 hour in the welding department and 2 hours
qaws [65]

Answer:

  • The solution that optimizes the profit is producing 0 small lifts and 50 large lifts.
  • Below are all the steps explained in detail.
  • The graph is attached.

Explanation:

<u />

<u>1. Name the variables:</u>

  • x: number of smaller lifts
  • y: number of larger lifts

<u></u>

<u>2.  Build a table to determine the number of hours each lift requires from each department:</u>

<u></u>

Number of hours

                                        small lift    large lift   total per department

Welding department            1x             3y                x + 3y

Packaging department        2x             1y                2x + y

<u></u>

<u>3. Constraints</u>

  • 150 hours available in welding:         x + 3y ≤ 150
  • 120 hours available in packaging:   2x + y ≤ 120
  • The variables cannot be negative:    x ≥ 0, and y ≥ 0

Then you must:

  • draw the lines and regions defined by each constraint
  • determine the region of solution that satisfies all the constraints
  • determine the vertices of the solution region
  • test the profit function for each of the vertices. The vertex that gives the greatest profit is the solution (the number of each tupe that should be produced to maximize profits)

<u></u>

<u>4. Graph</u>

See the graph attached.

Here is how you draw it.

  • x + 3y ≤ 150
  • draw the line x + 3y = 150 (a solid line because it is included in the solution set)
  • shade the region below and to the left of the line

  • 2x + y ≤ 120
  • draw the line 2x + y ≤ 120 (a solid line because it is included in the solution set)
  • shade the region below and to the left of the line

  • x ≥ 0 and y ≥ 0: means that only the first quadrant is considered

  • the solution region is the intersection of the regions described above.

  • take the points that are vertices inside the solutoin region.

<u>5. Test the profit function for each vertex</u>

The profit function is P(x,y) = 25x + 90y

The vertices shown in the graph are:

  • (0,0)
  • (0,50)
  • (42,36)
  • (60,0)

The profits with the vertices are:

  • P(0,0) = 0
  • P(0,50) = 25(0) + 90(50) = 4,500
  • P(42,36) = 25(42) + 90(36) = 4,290
  • P(60,0) = 25(60) + 90(0) = 1,500

Thus, the solution that optimizes the profit is producing 0 smaller lifts and 90 larger lifts.

3 0
2 years ago
Polygons similar? Justify your reasoning.(10 points each)
Liono4ka [1.6K]

Answer:

what vfvj u rdjmhgfx Uzumaki i

7 0
2 years ago
Read 2 more answers
Other questions:
  • Answer please lot's of points.
    14·2 answers
  • Mrs. Hanley shopping for school supplies for her children she picks up five folders and three notebooks for their classes and tw
    14·1 answer
  • Translate this sentence into an equation.<br><br> The difference of Mai's age and 12 is 60
    6·2 answers
  • A particular movie theater charges $ 9.00 per adult ticket and $ 3.5 0 per child ticket. Suppose 550 people attended a movie and
    8·2 answers
  • 8x + 4 = 44<br>What is x?<br><br>Test
    8·2 answers
  • Answer the following please :)
    5·1 answer
  • 6) Find mZCAB , PLS HELP.
    9·1 answer
  • Find the volume of a pyramid with a square base , where the area of the base is 7.5 cm ^ 2 and the height of the pyramid is 8.6
    13·1 answer
  • You deposit $1500 in an account that pays 5% interest compounded yearly. Find
    14·2 answers
  • Helia invested 4000 AED for 3 years with a compound interest rate of 1.5%, Calculate the worth of her investment at the end of t
    6·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!