1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Nata [24]
4 years ago
6

What is 9 more than the product of five and a number "n" written as an algebraic expression

Mathematics
2 answers:
masya89 [10]4 years ago
8 0
The answer is b : 5n+9
umka2103 [35]4 years ago
7 0
B. 9+5n

Product means to multiply, so the product of 5 and a number (n) would be 5n.
9 more means addition so

9+ 5n
You might be interested in
On a Saturday a library check out 66 books and if 18 of the books were fiction what is the ratio of nonfiction books to fiction
dalvyx [7]
66 - 18 = 48
Nonfiction : Fiction
48 : 18
Divide both by 6
8 : 3
8 0
4 years ago
Read 2 more answers
How do I know when to divide multiply add or subtract in a math word problem
deff fn [24]
It will says divided by or took away for subtracting and put in for adding
8 0
4 years ago
What is the product of -2 1/4 and 4 1/2
solmaris [256]
The answer would be <span>-10.125</span>
5 0
3 years ago
Read 2 more answers
The owner of a construction company would like to know if his current work teams can build room additions quicker than the time
frez [133]

Answer:

The claim that the current work teams can build room additions quicker than the time allotted for by the contract has strong statistical evidence.

Step-by-step explanation:

We have to test the hypothesis to prove the claim that the work team can build room additions quicker than the time allotted for by the contract.

The null hypothesis is that the real time used is equal to the contract time. The alternative hypothesis is that the real time is less thant the allotted for by the contract.

H_0: \mu=0\\\\H_1: \mu

The significance level, as a storng evidence is needed, is α=0.01.

The estimated standard deviation is:

s_M=\frac{s}{\sqrt{n}}=\frac{0.2}{\sqrt{16}} =0.2/4=0.05

As the standard deviation is estimated, we use the t-statistic with (n-1)=15 degrees of freedom.

For a significance level of 0.01, right-tailed test, the critical value of t is t=2.603.

Then, we calculate the t-value for this sample:

t=\frac{x-\mu}{s_M} =\frac{-0.32-0}{0.05}= -6.4

As the t-statistic lies in the rejection region, the null hypothesis is rejected. The claim that the current work teams can build room additions quicker than the time allotted for by the contract has strong statistical evidence.

8 0
3 years ago
Can someone please help me
Vlada [557]
>>>1/5 is the answer<<<
8 0
3 years ago
Other questions:
  • What's the perimeter of a rectangle with length 12 m and width 5 m
    6·1 answer
  • PLEASE HELP!!
    6·1 answer
  • Please help me with the last two in the pic
    9·2 answers
  • Alan's go kart travels 1750 feet per minute and Barry's go kart travels 21 miles per hour whose go kart travels faster round you
    15·1 answer
  • Which of the following best explains why cos2pi/3 is not equal to cos5pi/3?
    7·2 answers
  • What are the two angles whose sum is 90°?
    12·1 answer
  • The length of a rectangular vegetable bed is 3 feet more than twice the width. The length of the fence around the bed is 36 feet
    6·2 answers
  • Plot and connect the points A(-6, 2), B(3, -6), C(-6, -6), and find the area of the triangle formed.
    8·1 answer
  • WILL GIVE BRAINLIEST!!!!!!! find the value of x. find the value of y. :)​
    10·1 answer
  • (2x+5)^2=4x^2+kx+25 solve for k
    10·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!