Answer:
A tree with a height of 6.2 ft is 3 standard deviations above the mean
Step-by-step explanation:
⇒
statement: A tree with a height of 5.4 ft is 1 standard deviation below the mean(FALSE)
an X value is found Z standard deviations from the mean mu if:

In this case we have: 

We have four different values of X and we must calculate the Z-score for each
For X =5.4\ ft

Therefore, A tree with a height of 5.4 ft is 1 standard deviation above the mean.
⇒
statement:A tree with a height of 4.6 ft is 1 standard deviation above the mean.
(FALSE)
For X =4.6 ft

Therefore, a tree with a height of 4.6 ft is 1 standard deviation below the mean
.
⇒
statement:A tree with a height of 5.8 ft is 2.5 standard deviations above the mean
(FALSE)
For X =5.8 ft

Therefore, a tree with a height of 5.8 ft is 2 standard deviation above the mean.
⇒
statement:A tree with a height of 6.2 ft is 3 standard deviations above the mean.
(TRUE)
For X =6.2\ ft

Therefore, a tree with a height of 6.2 ft is 3 standard deviations above the mean.
Answer:
$12 per hour
Step-by-step explanation:
4320 / 9 = 480 per week / 40 = 12 per hour
Perimeter = a + b + c = 30
Area = 1/2 x a x b = 30
Multiples of 30: 2, 3, 5, 6, 10, 12, 15
For perimeter c = 30- (a+b)
C= sqrt( a^2 + b^2)
Using the possible combinations of the above:
5 and 12:
C = sqrt(5^2 + 12^2) = 13
5 + 12 + 13 = 30 for the perimeter
Area = 1/2 x 5 x 12 = 30
The sides are 5, 12 and 13 cm
Answer:
9
Step-by-step explanation:
Subtract 1 2 12 12 from both sides of the equation + 1 2 = 2 1 + 1 2 − 1 2 = 2 1 − 1 2 2 Simplify Solution = 9
Answer:
Who is the youngest in your family?