For the first one,
you multiply 5x and -5 to get -25.
Then you move the constant to the right and change the sign to get 3x= -21 +25.
Calculate the sum of -21+25 to get 4.
Divide both sides of the equation by 3 to get x=4/3.
So then your final answer is x=4
——
3
For the second one,
Distribute 7 through the parentheses to get 14x + 14+8=120
The you add 14+8 to get 22. Your equation should be 14x+22=120
Move the constant to the right side and change its sign to get 14x=120-22
Subtract 120-22 to get 98. Now your equation should be 14x=98
Divide both sides of the equation by 14 to get x=7.
Your finial answer for the second one should be x=7.
—————————————————————-
I hope this made sense.
Answer:
The angular velocity of Earth is π/12 radians per hour.
The angular velocity of Earth is 2π radians per day.
Step-by-step explanation:
A full circumference of a circle (as the Equator line on Earth) is 2π radians.
Since the planet does a full revolution in 24 hours... that means it makes a full turn in a day.
So, we can see that in a day, the planet rotates 360 degrees... or 2π radians per day!
Now, if you want to find the angular velocity per HOUR... you divide that by 24... so 2π/24 = π/12 radians
So, we can also say it does π/12 radians per hour.
The temperature was 1 because of you add them
-11+12=1
Answer:
C. 184 ft²
Step-by-Step Explanation:
The formula for the surface area of a triangular prism is
SA = bh + 2ls + lb; where b = base, h = height, l = length, s = side
First, substitute the known value into the equation:
b = 6 ft
h = 4 ft
l = 10 ft
s = 5 ft
SA = (6)(4) + 2(10)(5) + (10)(6)
Then, all we have to do is simplify:
SA = 24 + 2(50) + 60
SA = 24 + 100 + 60
SA = 184 ft²
Hope this helps!
The (0, 3] is taken out of the picture leaving you with B.
We have given that,
Machine 1 can complete a task in x hours while an upgraded machine (machine 2) needs 9 fewer hours.
We have to determine the,
The plant manager knows the two machines will take at least 6 hours, as represented by the inequality
after you find the intervals.
you also need to consider that the plant manager knows the two machines will take at least 6 hours.
so (0, 3] is taken out of the picture leaving you with B.
To learn more about the inequality visit:
brainly.com/question/24372553
#SPJ1