You need to put the whole question but I have a question like this and it’s 9 feet
Where are the numbers/inequality’s?
Answer:
17260
Step-by-step explanation:
multiply 14400 by 20%
After that add 14400 and 2880together
and you got the answer
To determine the cost of manufacturing one picture frame, add all the known cost by the number of frames produced. With the basis of one hour of operation,
Cost of wood per frame = $18.75 / 15 = $1.25
Cost of direct labor per frame = $ 13.50 / 65 = $ 0.21
Adding all up the costs,
total cost = $1.25 + $0.21 = $1.46
Therefore, manufacturing one picture frame costs approximately $1.46.
100 is the y intercept so its graohed at (0,100)(y-axis) and it goes up every 1/55