Answer:
5.25 hours
Step-by-step explanation:
The calculation of the time needed to schedule for all seven applications is shown below:
Since 3 by 4 is required of an hour to meet you show them
i.e.
= 3 ÷ 4 of an hour
= 3 ÷ 4 × 60 minutes
= 45 minutes
Now for seven applications, the time would be
= 7 × 45 minutes
= 315 minutes
And, one hour = 60 min.
So, the time required is
= 315 minutes ÷60 minutes
= 5.25 hours
Answer:
There is literally no line shown lol
Answer:
x = -2,1, 2
Step-by-step explanation:
g(x) = (x + 2)(x − 1)(x − 2)
Assuming we are looking for the roots
0 = (x + 2)(x − 1)(x − 2)
Using the zero product property
0 = x+2 0 =x-1 0 = x-2
x=-2 x = 1 x =2
A more explained answer to show your teacher that you know the material and are not cheating is to multiply 350 by 2.5. this is the equivalent of 2.5 gallons, and 350x2.5 is 350x2+350x.5=700+175=875 sq feet that 2.5 gallons will cover