Answer:
After 200 students, it would better to hire Band A
Step-by-step explanation:
350+ 1.25x = 600
1.25x = 250
x = 200
at 200 students the cost is the same for Band A and Band B
at 201 students Band A will be cheaper then Band B
Answer:
Judy = $5/hr
Ben = $4/hr
Step-by-step explanation:
Judy's hours at work - x
Ben's hours at work - y
8x + 10y = 80
9x + 5y = 65
Given these two equations above, we get:
10y = 80 - 8x, which means y = 8 - 0.8x.
Substitute y in the second equation with 8 - 0.8x, so we have:
9x + 5 (8 - 0.8x) = 65
9x + 40 - 4x = 65
5x = 25
x = 5
Come back to the first equation, substitute x:
8*5 + 10y = 80
10y = 80 - 40
y = 4
Answer:

Step-by-step explanation:
Because this quadratic equation would have the curve-down form of:

where a and b are positive coefficient.
If we let the peak (250 ft) of the curve be at x = 0. Then


Also at the begins and ends, thats where y = 0, the 2 points are separated by 100 ft. So let the begin at -50 ft and the end at 50ft. We have



Therefore, the model quadratic equation of our path would be

We know that there are 7 days in a week, so just divide 68 ÷ 7 and you should get 9.71 which is approximately 10 weeks