Answer:
The average velocity is 0.203 m/s
Explanation:
Given;
initial displacement, x₁ = 20 yards = 18.288 m
final displacement, x₂ = ¹/₃ x 18.288 = 6.096 m
change in time between 5:02 PM and 5:03 PM, Δt = 3 mins - 2 mins = 1 min = 60 s
The average velocity is given by;
V = change in displacement / change in time
V = (x₂ - x₁) / Δt
V = (18.288 - 6.096) / 60
V = 0.203 m/s
Therefore, the average velocity is 0.203 m/s
Answer:
15.64 MW
Explanation:
The computation of value of X that gives maximum profit is shown below:-
Profit = Revenue - Cost
= 15x - 0.2x 2 - 12 - 0.3x - 0.27x 2
= 14.7x - .47x^2 - 12
After solving the above equation we will get maximum differentiate for profit that is
14.7 - 0.94x = 0
So,
x = 15.64 MW
Therefore for computing the value of X that gives maximum profit we simply solve the above equation.
Answer:
ik true eedcggftggggfffff
Answer:
4. A series of steps engineers use to solve problems.
Explanation:
The process of engineering design is a sequence of procedures that engineers pursue to arrive at a solution to a specific problem. Most times the solution includes creating a product such as a computer code, which fulfills certain conditions or performs a function. If the project in-hand includes designing, constructing, and testing it, then engineers probably adopt the design process. Steps of the process include defining the problem, doing background research, specifying requirements, brainstorming solutions, etc.
<h2>
ANSWER</h2><h2>
</h2>
I had a couple of answers for this, but when I checked nothing
was right, so im not sure.
<h2>
</h2>