Answer:
$6,000,000
Explanation:
Change in risk = 0 in 1,000 to 1 in 1,000 = 0 to 0.001 = +0.001
Change in wage = $30,000 to $36,000 = +$6,000
Therefore:
wage/risk = 6,000/0.001
= $6 million or $6,000,0000
The value of a human life for workers with these characteristics should a cost-benefit analyst use is $6,000,000 because workers are willing to receive an extra $6,000 for a 1 in 1,000 increase in risk of death, implying a value of life of $6 million)Value of human life for workers with these characteristics = $6 million .
In order words the workers require $6,000 to accept a death risk of .001. The value of life implied by this is $6,000/.001 = $6,000,000.
Answer:
The correct answer is c) increases
Explanation:
If a stimulus plus a response results in a satisfying outcome, the probability of that response occurring again increases.
When the stimulus and response produce a satisfying outcome is because the answer had given an excellent outcome, which could cause it to happen again because it generates a satisfactory feeling, and the probability to increase, goes up.
Answer: True
Explanation:
When a sector contributes a significant amount to GDP suffers a shock, the GDP of the nation will be shocked as well. Proportionally it goes that the greater the shock to the sector, the greater the shock to the GDP.
For instance, Agriculture contributes a significant amount to GDP. If a drought were to hit that reduced harvests by 50%, the GDP will suffer a huge shock as well because the contribution from Agriculture will be significantly less.
Answer: The correct answer is "a. the ability of management to use accruals to reduce the volatility of reported earnings over time.".
Explanation: Income smoothing refers to <u>the ability of management to use accruals to reduce the volatility of reported earnings over time.</u>
The smoothing of earnings is a practice that consists in reducing fluctuations in recognized income and, therefore, fluctuations in earnings. That is, the smoothing of earnings implies saving income in bonanza times to recognize them accountingly when income is meager.
Answer:
Total cost for Job 9-1005 = $ 5,085
Explanation:
Calculation for total cost for Job 9-1005
Direct materials
Q-4698 $1,250
Q-4725 <u>$1,000</u>
<u>Total Direct material cost = $ 2,250</u>
Direct labor
W-3393 $ 600
W-3479 $ 450
W-3559 <u>$ 300</u>
<u>Total direct labour Cost = $ 1,350</u>
add: Overhead cost 110% of total direct labor cost: $1,350×110%= $1,485
Total Cost on Job is: $2,250+$1,350+$1,485 = $5,085