1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
sesenic [268]
3 years ago
10

A granite installation company schedules its services based on the installation space. It schedules 3 hours for a standard kitch

en installation and 1 hour for a standard bathroom installation. The company schedules a maximum of 12 hours of installation time per day, and performs no more than 3 bathroom installations per day. The average profit for a bathroom installation is $1200, and the average profit for a kitchen installation is $3300.
Part A: How many kitchen and bathroom installations should the company schedule per day in order to maximize profit?
Part B: How much money does the company earn per day if it maximizes profit?
Mathematics
2 answers:
dsp733 years ago
5 0

Answer:

Part A

3 Bathroom and 3 Kitchen

Part B.

$13,500

Step-by-step explanation:

Bathroom per day = 3

Average profit of Bathroom = $1,200 per hour

Kitchen per day = (12 hours - 3 hours)/3 = 3 kitchen

Average Profit from Kitchen = $3,300 / 3 = $11,00 per hour

As the company cannot do more than 3 bathrooms which has higher per hour average profit, the remaining 9 hours will be utilized  for Kitchen Installation.

Part A.

Company will do 3 Bathrooms and 3 Kitchens in order to maximize the profit under given condition.

Part B.

Total Earning = ($1,200 x 3 ) + ($1,100 x 9 ) = $3,600 + $9,900 = $13,500

The company will earn Average profit of $13,500.

ASHA 777 [7]3 years ago
5 0

Answer: Part A; The company should schedule 3 Kitchen installations and 3 Bathroom installations

Part B; The company would earn $13500 per day if it maximizes profit.

Step-by-step explanation: The first thing to note is that the company has a schedule of 12 hours of installation per day at the maximum. Also they cannot carry out more than 3 bathroom installations per day and they have scheduled each bathroom installation to take one hour. This means they have nine hours left for Kitchen installations. Each kitchen installation takes three hours, and that means they cannot exceed three kitchen installations. So for the twelve hours maximum which they have scheduled, it would be best if they apportioned it’s as follows;

Kitchen Installations: 3 (x 3hrs) = 9hrs

Bathroom Installation: 3 (x 1hr) = 3hrs

If the profit per kitchen installation is given as $3300, and that of bathroom installation is given as $1200, then the maximum profit they should be realizing daily is given as,

Profit = 3 x (3300) + 3 x (1200)

Profit = 9900 + 3600

Profit = 13500

Their maximum profit would be $13,500

You might be interested in
Use signed numbers to solve. A helicopter descended 1200 feet, rose 800 feet, and then descended 450 feet. What was the net gain
sergey [27]
The rise or an increase in altitude is represented by positive sign and a decend or decrease in altitude is represented by negative sign. 

First the helicopter descended 1200 feet. So the change in altitude will be -1200 feet.

Then the helicopter rose by 800 feet. So the change in altitude will be 800 feet.

Finally the helicopter descended by 450 feet. So the change in altitude will be -450 feet.

The net change in altitude will be the sum of all the above 3 changes. 
Change in altitude = -1200 + 800 - 450 = -850 feet

The negative sign indicates a descend i.e. loss in altitude. So the net change in altitude was a loss of 850 feet. 
3 0
4 years ago
What is the measure of n?
horsena [70]

The value of n is 32 if the total; base length is 12(8+4) and n is the length of the perpendicular.

<h3>What is a right-angle triangle?</h3>

It is a triangle in which one of the angles is 90 degrees and the other two are sharp angles. The sides of a right-angled triangle are known as the hypotenuse, perpendicular, and base.

We can use the altitude rule:

8/n = n/4

n² = 32

n = √32

Thus, the value of n is 32 if the total; base length is 12(8+4) and n is the length of the perpendicular.

Learn more about the right angle triangle here:

brainly.com/question/3770177

#SPJ1

8 0
2 years ago
Doughnuts at one shop cost £1.20 each.
charle [14.2K]

Answer: 30p

Step-by-step explanation:

Cost of donuts in the first shop £1.20

Cost at the second shop at 25% higher

= 1.20 x 1.25 = 1.50

Difference in price

= 1.50 - 1.20 = 0.30

3 0
3 years ago
7. The length of a rectangle is 3 centimeters less than twice its width. The perimeter of the rectangle is 48 cm. What are the d
irga5000 [103]
The answer is b

The perimeter of a rectangle is 2(l + w) so in this case, it is 2(15 + 9) and that is equal to 48. But so at c and d. So u need to multiply the width by 2 (9*2=18) and then you’ll see that 18-3=15. And therefore, the length is -5 and the width is 9
5 0
3 years ago
If you know this please help
Anuta_ua [19.1K]

Answer:

its c hope this helps:)

Step-by-step explanation:

4 0
3 years ago
Other questions:
  • How to solve this problem. I don’t know how to do this and need help desperately
    7·1 answer
  • 3-7*(16/2+3-1)+6 showing this work
    5·1 answer
  • What is the slope of the line?<br><br>-5/2 -2/5 2/5 5/2<br>what is -5 + -2 ​
    7·1 answer
  • What is the dependency ratio?
    9·1 answer
  • Write "48 gallons in 14 days" as a unit rate. Round to the nearest hundredth, if necessary.
    13·1 answer
  • Please help me with this question because I am lost
    12·1 answer
  • X+2y=8 graph it please
    7·1 answer
  • To estimate the average salary among people in a certain district, a marketing team obtains a simple random sample of 100 people
    7·1 answer
  • I need help asapppppppppppppp
    7·1 answer
  • A candy company puts 3 gumdrops in each bag. How many gumdrops will the company need to fill 5,000 bags?
    12·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!