1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
eimsori [14]
3 years ago
10

How to help it automation with python professional certificate?

Computers and Technology
1 answer:
arlik [135]3 years ago
3 0

Answer:

Following are the answer to this question:

Explanation:

As we know, that Python is based on Oop's language, it allows programmers to decide, whether method or classes satisfy the requirements.  

  • It's an obvious benefit, in which the system tests the functions, and prevent adverse effects, and clear the syntaxes, which makes them readable for such methods.
  • All the framework uses the python language, that will be used to overcome most every coding task like Mobile apps, desktop apps, data analyses, scripting, automation of tasks, etc.
You might be interested in
A working model of a new product for testing purposes.
kotykmax [81]
Prototype is a working model for a product only for  testing purposes
6 0
3 years ago
How many wins does ninja have :/
den301095 [7]

Answer:

he played 13,500 games and has 37 percent win rate

5 0
3 years ago
Question # 7 Dropdown Select the correct word to complete the sentence. The original ARPANET had four nodes and connected groups
attashe74 [19]

Answer:

Facility

Explanation:

This is the answer because you can spell it out with Horizon.

4 0
3 years ago
Read 2 more answers
A certain program takes 26.67 seconds to run on 3 processors and 16 s to run on 7 processors. Find the execution time on one pro
brilliants [131]

Answer:

The explanation for the question is listed in the section below on Explanation.

Explanation:

The time needed for a program to execute in 26.67 seconds on 3 processors. Time expected to run the program, therefore, should be as follows:

The time to run on one processor = \frac{26.67}{3} = 8.89 seconds.

The time needed for a program to execute in 26.67 seconds on 7 processors, should be:

Time = \frac{16}{7} = 2.2857 seconds.

Whenever the amount of processors increases the performance or speed should increase.

The time is taken in percentage = \frac{26.67}{16}×100% = 170 %

As the number of processors increases from 3 to 7, the time required according to each processor increases by 70%.

In one processor the execution time should be as follows:

26.67+(26.67×0.7) = 45.339

                              = 45 seconds

Therefore. the execution period for a single processor is about 45 seconds.

The work is performed in parallel, whereas the program is already being parallelized. The overall function ought to be shared between the processor. The time is shortened to around half. Hence the duration taken will be 8 seconds after parallelization.

Theoretical execution time would be Tp > T infinity.

Thus, T infinity<45

The theoretical processing interval on processor count P1/2 would therefore be less than 8 seconds. Because, the time required during parallelization was just that.

5 0
3 years ago
What is a Database, Flat file and Relational Database?
Marta_Voda [28]

Answer:

A flat file database stores data in a single table structure. A relational database uses multiple table structures, cross-referencing records between tables. Tables in both organize records in rows, with each column containing a single piece of data in the record.

8 0
2 years ago
Other questions:
  • Why would someone need to use tools like IECacheView or MyLastSearch on a system? Do companies have the right to search a workst
    11·1 answer
  • Which of the following is FALSE?
    8·1 answer
  • Read each scenario, and then select the best wireless device for the worker’s needs. A trucker is constantly on the road. He fre
    8·2 answers
  • If you see an icon in a document preset that looks like a tiny web browser window, what type of document is the preset meant to
    13·1 answer
  • How to program a concrete Damage-Plasticity material?
    5·1 answer
  • There are six different sequences for the three approval tasks: check inventory; check credit; check special terms.
    5·1 answer
  • One way to prepare for filing the PROFILE is to:
    12·2 answers
  • Each object in your database application is shown in the
    12·1 answer
  • Which UML relationships should be used between a subclass and a superclass? For example, suppose there is an interface or abstra
    5·1 answer
  • Which of the following activities does an effective team do?
    15·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!