1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Sidana [21]
3 years ago
7

Seattle-Pipes Co. produces pipes to be supplied to a Seattle utility company. The requirement of the utility company is that the

pipes need to be 200 cm long. Longer pipes are acceptable to the utility company but any pipe less than 200 cm is rejected. Seattle-Pipes loses all its production costs on pipes that are rejected. The production process is such that it has some variability in the lengths of pipes produced, and this variability can be well approximated by a Normal distribution. Seattle- Pipes can adopt one of the following three production processes:
Process A: Produces pipes with an average length of 200 cm and a standard deviation of 0.5 cm
Process B: Produces pipes with an average length of 201 cm and a standard deviation of 1 cm
Process C: Produces pipes with an average length of 202 cm and a standard deviation of 1.5 cm
a. If Seattle-Pipes adopts the third Process (Process "C'), what is the probability it will have its pipe rejected by the utility company? Enter your answer as a decimal probability (not a percent) rounded to 4 decimal places.
b. Seattle-Pipes temporarily changes its requirements and has a new requirement that it will accept any pipe of length from 199 cm to 202 cm. That is, pipes ranging in length from 199 cm to 202 cm will be accepted, others will be rejected. With this changed requirement, which production process (out of the 3) will result in the smallest percentage of rejections?
c. Seattle-Pipes earns a revenue of $200 for every pipe that gets accepted and loses all money for any pipe that is rejected. The cost of producing the pipes is $140 per pipe if the production process "A" is used, $160 per pipe if the production process "B" is used, and $177 per pipe if the production process "C" is used. Given this information, which production process would you recommend maximizing profits (revenue minus cost) if the requirement of the utility company is that pipes need to be of 200 cm (or more and any pipe shorter than 200 cm is rejected?
Mathematics
1 answer:
Goshia [24]3 years ago
6 0

Answer:

Step-by-step explanation:

Hello!

The study variable is

X: Pipe length.

It is known that this variable has a normal distribution and that the distribution parameter varies depending on the process used to manufacture the pipes.

Process A: μ= 200cm δ= 0.5cm

Process B: μ=201cm δ= 1cm

Process C: μ=202cm δ= 1.5cm

Pipes with a length of 200cm or more will be accepted by the utility company (X≥200), but pipes with less than 200cm length will be rejected (X<200)

a. Using Process C, you need to calculate the probability that the pipe will be rejected, symbolically:

P(X<200)

Using the distribution data of process C you have to standardize the value:

P(Z<(200-202)/1.5)= P(Z<-1.33)= 0.09176

b. The requirements change, accepting any pipe between 199 and 202, you have to calculate the probabilities of the pipes being between those lengths using the three process:

Process A:

P(199≤X≤202) = P(X≤202) - P(X≤199)

P(Z≤(202-200)/0.5)) - P(Z≤(199-200)/0.5))

P(Z≤4) - P(Z≤-2) = 1 - 0.02275 = 0.97725

The probability of the pipe being rejected is 0.02275

Process B:

P(199≤X≤202) = P(X≤202) - P(X≤199)

P(Z≤(202-201)/1)) - P(Z≤(199-201)/1))

P(Z≤1) - P(Z≤-2) = 0.84134 - 0.02275 = 0.81859

The probability of the pipe being rejected is 1-0.81859= 0.18141

Process C:

P(199≤X≤202) = P(X≤202) - P(X≤199)

P(Z≤(202-202)/1.5)) - P(Z≤(199-202)/1.5))

P(Z≤0) - P(Z≤-2) = 0.5 - 0.02275 = 0.47725

The probability of the pipe being rejected is 1-0.47725= 0.52275

The pipes manufactured using process A has fewer chances of being rejected.

c.

Process A costs $140

P(X≥200)= 1 - P(X<200)= 1 - P(Z<0)= 1 - 0.5= 0.5

Process B costs $160

P(X≥200)= 1 - P(X<200)= 1 - P(Z<-1)= 1 - 0.15866= 0.84134

Process C costs $177

P(X≥200)= 1 - P(X<200)= 1 - P(Z<-1.33)= 1 - 0.09176= 0.90824

If they where to make 100 pipes:

Using process A: 100*0.5= 50 pipes will be accepted, so they'll win 50*($200-$140)= $3000

Using process B: 100*0.84134= 84.134≅ 84 pipes will beaccepted, so they'll win 84*($200-$160)= $3360

Using the process C: 100*0.90824= 80.824≅ 90 pipes will be accepted, so they'll win 90*($200-$177)= $2070

As you can see, using process B will maximize the profits.

I hope it helps!

You might be interested in
PLEASE HELP ME WITH THIS QUESTION I WILL GIVE BRAINLIEST!!!
Scrat [10]

Answer:

I think is B

Step-by-step explanation:

6 0
3 years ago
Two cooks purchased plates and cups at the same store. The first cook bought 4 plates and 5 cups for a total of $25.25. The seco
Irina18 [472]
The answer should be 2.55 per plate

3 0
3 years ago
Solve the quadratic by factoring.<br> x^2+ 15x = 5x – 24
vagabundo [1.1K]
I think it is X=-4,-6
7 0
3 years ago
Which of the binomials below is a factor of this trinomial?
Brut [27]

i think its but im not sure

6 0
3 years ago
Read 2 more answers
Sofia surveyed students at her school
IRISSAK [1]

Answer:

English,French,Vietnamese,Chinese,Ukrainian,other

Step-by-step explanation:

so basically the question is asking for us to convert the fractions into decimals and then, order the them from greatest to least

Q:how do you convert a fraction into a decimal?

A: numerator divided by denominator for example if you had to convert 7/9 into a decimal you would do 7 divided by 9!!!

English:1/4 is equivalent to 0.25

Ukrainian:1/20 is equivalent to 0.05

Vietnamese:0.02 is already in decimal form

French:1/10 is equivalent to 0.1

Chinese:0.02 is already in decimal form

Other:0.06 is already in decimal form

<em>Now we got all the fractions converted into decimals</em>

0.25,0.05,0.02,0.1,0.02,0.06

Now we have to put these number from greatest to least

Q:how do we put it in greatest to least?

A: if there are more zeros in the place value its more likely to be a small number for example 0.06 is smaller than 0.3

0.25 is the greatest

0.1 is the second greatest

0.02 is the third greatest

0.02 is the third greatest

0.05 is the 4th greatest

0.06 is the 5th greatest

Now we got them from greatest to least so we match the decimal numbers to the language

Starting from greatest to least is: English,French,Vietnamese,Chinese,Ukrainian,other

pls mark me brainliest

6 0
3 years ago
Other questions:
  • Which equation shows the quadratic formula used correctly to solve 7x^2 = 9 + x for x?
    14·1 answer
  • 40% of what number is 10.2?
    13·1 answer
  • Betty had $40 in her pocket. She bought 12 identical bags of popcorn. Betty was left with $10 after buying the popcorn. What was
    11·2 answers
  • Complete table of values <br><br><br>with working out
    5·1 answer
  • If anyone can help that would be great!
    9·1 answer
  • Please help this is for a quiz i'll give you brainliest HURRY
    10·1 answer
  • Whats up with the people and those files?
    6·1 answer
  • Match each division expression to its quotient
    13·1 answer
  • Apply the square root principle to solve (x – 2)2 + 20 = 0.
    12·1 answer
  • What the avage of 87.25
    10·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!