For this case we have the following relationship:
Total cost = (Unit Cost) * (Number of meters)
Therefore, substituting values in the given equation we have:
Total cost = (10.69) * (0.70)
Total cost = $ 7,483
This means that Sid will spend $ 7,483 to do the work.
Answer:
Sid will spend about $ 7,483.
Answer:
it's a black screen
Step-by-step explanation:
black screen
Answer:
slope: 
equation: 
Step-by-step explanation:

- point-slope form of Equation of the Line

a.
This is the geometric sequence: a1 = 1.5 m = 150
cm, r = 0.74
The formula now is an = a1 x r ^ n-1
Just substitute a1 = 150 cm and r = 0.74
an = 150 x (0.74) ^ n – 1
b.
The second part is:
A6 = 150 x 0.74 ^ 6-1
= 150 x 0.74 ^5
= 150 x 0.221906624
= 33.28509936 cm
45.5%, or 4.55, for 455/1000.
91/200