demand per day = 58 pans
Due to availability of two workers we can have parallel we can have deep drawing and trimming operations simultaneously.
Hence the cycle time would be the greater time of the two operations.
cycle time = 450 seconds


(which is greater than the demand of 58 pans)
Therefore the work cell has sufficient capacity and time (496 sec.>cycle time 450 sec) to meet the demand.
b)
Required daily production is 58 pans
Collinear system refers to the type which involves all of the forces acting on the exact same line of action .
<h3>What is Force?</h3>
This is referred to an influence which is capable of altering the motion of an object or particle.
Collinear system has forces which acts on the same line. If X, Y and Z are collinear then m X Y = m Y Z ( = m X Z ) .
Read more about Collinear system here brainly.com/question/19864989
#SPJ1
Answer:
Some of the major application of solar energy are as follows: (a) Solar water heating (b) Solar heating of buildings (c) Solar distillation (d) Solar pumping (e) Solar drying of agricultural and animal products (f) Solar furnaces (g) Solar cooking (h) Solar electric power generation (i) Solar thermal power production (j) Solar green houses.
Pump is the Association with the variable inside the earths planet
Answer:
from the steam table
we get to know the values


we have

to find s 2

so the entropy change is

put values