Answer:
yksykskyskgsykslydhdlhdyldkydkydydyodyldgkdlydlyd
<span>Multiply one of the equations so that both equations share a common complementary coefficient.
In order to solve using the elimination method, you need to have a matching coefficient that will cancel out a variable when you add the equations together. For the 2 equations given, you have a huge number of choices. I'll just mention a few of them.
You can multiply the 1st equation by -2/5 to allow cancelling the a term.
You can multiply the 1st equation by 5/3 to allow cancelling the b term.
You can multiply the 2nd equation by -2.5 to allow cancelling the a term.
You can multiply the 2nd equation by 3/5 to allow cancelling the b term.
You can even multiply both equations.
For instance, multiply the 1st equation by 5 and the second by 3. And in fact, let's do that.
5a + 3b = –9
2a – 5b = –16
5*(5a + 3b = -9) = 25a + 15b = -45
3*(2a - 5b = -16) = 6a - 15b = -48
Then add the equations
25a + 15b = -45
6a - 15b = -48
=
31a = -93
a = -3
And then plug in the discovered value of a into one of the original equations and solve for b.</span>
<span>Answer:
We'll have to integrate the growth rate with respect to time, without forgetting the amount of area covered at the start.
A = 2010 + â« 8t1/2 dt (as t goes from 0 to 24)
A = 2010 + [(16/3) t3/2] (as t goes from 0 to 24)
A = 2010 + 627 = 2637 acres
We don't integrate the 2010 here because whatever effects of the passing of time have already taken place over that area. We just treat it as a constant and add it to the result of integration.</span>
Answer:
29.32
Step-by-step explanation:
sense 1 is the hundredth you just round now so 5 is big enough so it would make the hundreth number go up by 1.
(0,5.25)(10,13.75)
slope(m) = (y2 - y1) / (x2 - x1)
slope(m) = (13.75 - 5.25) / (10 - 0) = 8.5/10 = 0.85
y = mx + b
(0,5.25)...x = 0 and y = 5.25
slope(m) = 0.85
now we sub, we r looking for b, the y int
5.25 = 0.85(0) + b
5.25 = b
so ur equation is : y = 0.85x + 5.25 or C(t) = 0.85t + 5.25 <==
cost of a 12 min taxi ride.....sub in 12 for t
C(t) = 0.85t + 5.25
C(12) = 0.85(12) +5.25
C(12) = 10.20 + 5.25 = 15.45
so a 12 min ride would cost u : $ 15.45 <==