Using the normal distribution, there is a 0.5398 = 53.98% probability that a randomly selected cyclist will take at least 2.45 hours to complete the race.
<h3>Normal Probability Distribution</h3>
The z-score of a measure X of a normally distributed variable with mean
and standard deviation
is given by:

- The z-score measures how many standard deviations the measure is above or below the mean.
- Looking at the z-score table, the p-value associated with this z-score is found, which is the percentile of X.
The mean and the standard deviation are given, respectively, by:

The probability that a randomly selected cyclist will take at least 2.45 hours to complete the race is <u>one subtracted by the p-value of Z when X = 2.45</u>, hence:


Z = -0.1
Z = -0.1 has a p-value of 0.4602.
1 - 0.4602 = 0.5398.
0.5398 = 53.98% probability that a randomly selected cyclist will take at least 2.45 hours to complete the race.
More can be learned about the normal distribution at brainly.com/question/4079902
#SPJ1
The result of an absolute value operation is never negative. So the smallest that the expression |x+5| can be is 0.
Tacking on "-8" to |x+5| leads to |x+5|-8
The range of this is [-8, infinity) since the smallest |x+5|-8 can be is -8. All I did was subtract 8 from the smallest value of |x+5|
Final Answer: choice C)
Answer:
neither, would technically be intersecting lines tho
Step-by-step explanation:
Answer:
Step-by-step explanation:
hey hellojuhb ndjuy7GB
Answer:
48.06
Step-by-step explanation:
b^2+c^2=A^2
45+16=42.06
add the extra 6