Answer:
General equation of line :
--1
Where m is the slope or unit rate
Table 1)
p d
1 3
2 6
4 12
d = Number of dollars (i.e.y axis)
p = number of pound(i.e. x axis)
First find the slope
First calculate the slope of given points
---A


Substitute values in A
Thus the unit rate is 3 dollars per pound.
So, It matches the box 1 (Refer the attached figure)
Equation 1 : 

Since p is the x coordinate and d is the y coordinate
On Comparing with 1

Thus the unit rate is
dollars per pound
So, It matches the box 2 (Refer the attached figure)
Equation 2 : 

Since p is the x coordinate and d is the y coordinate
On Comparing with 1

Thus the unit rate is 9 dollars per pound
So, It matches the box 3 (Refer the attached figure)
Table 2)
p d
1/9 1
1 9
2 18
d = Number of dollars (i.e.y axis)
p = number of pound(i.e. x axis)


Substitute values in A
Thus the unit rate is 9 dollars per pound
So, It matches the box 3 (Refer the attached figure)
Answer:56
Step-by-step explanation:
i got it correct on my test
Answer:
He must work 52 days to pay for a single ticket.
Step-by-step explanation:
This question can be solved using proportions.
Per hour:
Joel earns $7.25 per hour, 20% of which is deducted for taxes. So without taxes, in each hour, he earns 100%-20% of 80% of this, so 0.8*7.25 = $5.8.
Per day:
He works 9 a.m. to 5 p.m. each day, so 8 hours a day.
For each hour, he earns $5.8.
So in a day, he makes 8*5.8 = $46.4
How many days he must work:
The ticket costs $2400.
He makes $46.4 a day.
So, to buy a ticket, he needs to work:
2400/46.4 = 51.7 days
Rounding up
He must work 52 days to pay for a single ticket.
Answer:
A
Step-by-step explanation:
30% of 4
4÷100=0.04
0.04×30=1.2