1st = -5*2^(1-1) = -5*2^0 = -5*1 = -5
4th = -5 *2^(4-1) = -5*2^3 = -5 *8 = -40
8th = -5*2^(8-1) = -5 *2^7 = -5 *128 = -640
Answer is 1st choice
This answer is quadrant 3 because if you do the math then you end up in quadrant 3
Answer:
A function that gives the work required in foot-lbs to lift the bucket up x feet from the ground is
and the work to get the bucket to the top of the cliff is 3726 foot-lbs
Step-by-step explanation:
Work done to lift the rope by distance x feet:

Work done to lift the bucket by distance x feet:

On reaching top 7 gallons of water spilled out so , on going up by x feet
gallons of water spilled out.
a function that gives the work required in foot-lbs to lift the bucket up x feet from the ground:

Now the work to get the bucket to the top of the cliff i.e. x =35

W=3726
Hence, a function that gives the work required in foot-lbs to lift the bucket up x feet from the ground is
and the work to get the bucket to the top of the cliff is 3726 foot-lbs