1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
defon
3 years ago
6

Explain how to estimate 368 + 231 two different ways

Mathematics
1 answer:
Zanzabum3 years ago
7 0
If you round 368 to the nearest tens place you get 370. 231 becomes 230. 370+230. The estimate would be 600. Another way is you can round to the hundreds place. 368 becomes 400 and 231 becomes 200. 400+200 is 600, as well.
You might be interested in
Determining Cost of Land
irakobra [83]

The complete question is:

On-Time Delivery Company acquired an adjacent lot to construct a new warehouse, paying $90,000 in cash and giving a short-term note for $50,000. Legal fees paid were $1,750, delinquent taxes assumed were $25,000, and fees paid to remove an old building from the land were $9,000. Materials salvaged from the demolition of the building were sold for $1,000. A contractor was paid $415,000 to construct a new warehouse. Determine the cost of the land to be reported on the balance sheet.

The cost of land to be reported exists at $174,750.

<h3>How to determine the cost of the land to be reported on the balance sheet?</h3>

The cost of land noted in the balance sheet does not only contain the price spent to gain the land but also includes any costs/revenue obtained in the procedures, and activities required to obtain the land to the setting in which it may be prepared for use.

Therefore, except for the price paid which exists at $140,000 ( $90,000 cash and $50,000 short-term note), we have to count up all the applicable expenses including Legal fees, delinquent taxes, Disposal of old building expenditures and remove the material salvaged profit from the destruction of the old building. The construction cost of the new warehouse exists extraneous here as, without this cost, the land exists already in a ready-to-use stage ( i.e: for building a new property on the land)

So, the amount of Cost of land to be reported exists

140K + 1,75K + 25K + 9K - 1K = $174,750.

To learn more about balance sheet refer to:

brainly.com/question/1113933

#SPJ9

8 0
2 years ago
Suppose you have been on the train for at least 5 hours. A passenger
lesya692 [45]

Answer:

h \leq 5

Step-by-step explanation:

Time already spent on the train is at least 5 hours

Since the trip to Fairbanks take 10 hours, we have that, the sum of the number of hours left, h and the time already spent will be equal to 10.

t+h=10\\$Since the time for which the passenger has been on the train \geq 5\\5+h \leq 10\\h \leq 10-5\\$The inequality that describes in how many more hours, h the train will reach Fairbanks, therefore, is:\\h \leq 5

4 0
3 years ago
This is just a test, but what’s 17 to the power of 9
Ganezh [65]

Answer:

118,587,876,497

Step-by-step explanation:

17^{9} = 17 * 17 * 17 * 17 * 17 * 17 * 17 * 17 * 17 = 118,587,876,497

7 0
3 years ago
Read 2 more answers
Can someone help with this please?
siniylev [52]

Answer:

1 is linear, 2 is linear, 3 is not linear, 4 is not linear

4 0
3 years ago
Read 2 more answers
Layna can paint a 350-square foot room in 4 hours. It takes Bebe 7 hours to paint the same room. Which equation can be used to f
ohaa [14]

The equation can be used to find the time in hours, \dfrac{t}{4}+\dfrac{t}{7}=1 and the time will be 2.5 hours. So the correct answer is option A.

<h3>What is an equation?</h3>

It is defined as the relation between two variables, if we plot the graph of the linear equation we will get a straight line.

Layna can paint a 350-square-foot room in 4 hours.It takes Bebe 7 hours to paint the same room.

Let t be the total time taken by both to paint.They are completing 1 job so the equation will be :

\dfrac{t}{4}+\dfrac{t}{7}=1

Further solving it we get;

7 t + 4 t = 28

11t  =  28

t = 2.5 hours.

Therefore the equation can be used to find the time in hours, \dfrac{t}{4}+\dfrac{t}{7}=1 and the time will be 2.5 hours. So the correct answer is option A.

To know more about equations follow

brainly.com/question/2972832

#SPJ1

8 0
2 years ago
Other questions:
  • Simplify the square root of 8^17
    5·1 answer
  • I will give brainliest if you answer this question !!!
    14·1 answer
  • It says to list the new points of W’ X’ Y’ Z, could anyone please help?
    10·1 answer
  • Please help with this thanks
    5·2 answers
  • A bottle holds 24 ounces of water. It has x ounces of water in it. a. What does 24 - x represent i this situation?
    7·2 answers
  • 10. A medium pizza at Danny's Pizza costs $13.60 plus $2.50 for each topping. At Nicki's Pizza, a medium pizza costs $14.60 plus
    7·1 answer
  • Base =____ Inches ^2
    8·1 answer
  • In a meeting, every American handshakes with every Japanese just once, every Japanese handshakes with every Russian just once an
    14·1 answer
  • Solve for x. Round to the nearest tenth, if necessary.
    14·1 answer
  • Help me pls I don't understand.
    8·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!