1. Which polygon or polygons are regular?
A regular polygon is a polygon that is equiangular (all angles are equal in measure) and equilateral (all sides have the same length).
Therefore your answer is:
A. equilateral triangle
C. square
2. Which polygon is always irregular?
traingle - NOT (equilateral triangle)
trapezoid - YES
square - NOT
hexagon - NOT (regular hexagon)
Answer:
x = a(c - b)
General Formulas and Concepts:
<u>Pre-Algebra</u>
Step-by-step explanation:
<u>Step 1: Define Equation</u>
x/a + b = c
<u>Step 2: Solve for </u><em><u>x</u></em>
- Subtract <em>b</em> on both sides: x/a = c - b
- Multiply <em>a</em> on both sides: x = a(c - b)
Answer:
L = 25
Step-by-step explanation:
Let's call the Length x and width x - 15 since the width is 15 less than length
Eric needs 70 of fencing in total, the perimeter of a rectangle is calculated by adding all sides
x + x + (x - 15) + (x - 15) = 70 add like terms
4x - 30 = 70 add 30 to both sides
4x = 100 divide both sides by 4
x = 25
Here we're applying a basic physics rule for vertical motion where the only pull on the object is gravity.
This rule has the form
h(t) = h + v t + (1/2)a*t^2
o o
To adapt this rule to this particular question replace h with 0, as the
o
upward path of the object begins at 0 ft. Replace v with +15 ft/sec.
o
Replace "a" with (-32.2 ft/(sec^2); this is the acceleration due to gravity.
Then we have the following, with the label F(t):
F(t) = 0 + (15 ft/sec)t + (1/2)(-32.2 ft)/(sec^2), or
F(t) = 15t - 16.1t^2. Thus, Choice D is correct.
Please note: To avoid confusion, please use " ^ " to denote exponentiation:
F(t) = -16t^2 + 15t
Answer: it will take 6 months for both gyms to cost the same.
Step-by-step explanation:
Let m represent the number of months that it will take for the cost of both gyms be the same.
At one gym, there is a $12 start-up fee, and after that each month, m, at the gym costs $20. This means that the total cost for m months is
12 + 20m
At another gym, each month at the gym costs $22. This means that the total cost for m months is 22m
For both costs to be the same, the number of months would be
12 + 20m = 22m
22m - 20m = 12
2m = 12
m = 12/2 = 6