<span>The strategy of appealing to different types of customers in this way is an example of product definition.
</span><span>The product definition includes product concept, design requirements and specifications, features, target market.
</span>First the company must understand the customer<span> needs and then it should convert this understanding into technical requirements for a new </span>product<span>.</span>
Answer: Ralph does not have a good claim against Snowdrop, because age was not the deciding factor in Snowdrop’s decision to lay off Ralph.
Explanation: The reason for the firm laying off Ralph is vague and not explicitly stated. Therefore Ralph cannot make a claim against Snowdrop for laying him off due to his age.
Answer:
1. Point on x-axis will increase and so will the point on the y-axis
2. All of the above
Explanation:
1. The Production Possibilities Frontier shows the amount of resources needed to produce different quantities of two goods. It therefore allows one to see the trade-off in resources for producing more of one good vs the other.
When a factor of production leads to more efficiency in the production of a good, the frontier will increase. In this scenario, there has been a growth in technology which means that more of both goods can be produced. This will increase the PPF on both axis. (Refer to attached file).
2. All of the listed options have led to increases in the standard of living in the last century. More education means people can get better jobs and build more infrastructure. International trade has increased market access and increased wealth. Farm productivity is better so more people can be fed and improvement in technology is the main driver for growth.
Answer:
False
Explanation:
Recovery time objective(RTO) - The main objective of RTO is to work on the real-time designation. It works to define lost or re-entered data during the downtime of the network. The purpose of RTO is to define the actual working time before a disturbance begins.
It defined to that time period during which the unprocessed process can be recovered after the disturbance occurs during any business operation.
Answer:
Total cost= $6,765
Explanation:
Giving the following information:
Total direct labor-hours 70,000
Total fixed manufacturing overhead cost $511,000
Variable manufacturing overhead per direct labor-hour $ 2.10
<u>First, we need to calculate the predetermined overhead rate:</u>
Predetermined manufacturing overhead rate= total estimated overhead costs for the period/ total amount of allocation base
Predetermined manufacturing overhead rate= (511,000/70,000) + 2.1
Predetermined manufacturing overhead rate= $9.4 per direct labor hour
<u>Job K913:</u>
Total direct labor-hours 150
Direct materials $ 705
Direct labor cost $4,650
Total cost= 705 + 4,650 + (150*9.4)
Total cost= $6,765