Work=speed times time (my equation to help me figure it out)
ok, 10 men take 84 days to complete a job
therefor, each man completes 1/10 of the job in 84 days
each man does 1/840 of the job per 1 day
so, if we had 5 more, or 15 men
15 times 1/840 times xdays=1 job complete
15/840 times xdays=1job
times both sides by 840/15
xdays=840/15
xdays=56
56 days it would take
Answer: 85.5
Step-by-step explanation:
There are 22 data points in the data set.
We can find the median by looking at the 11th and 12th scores, and averaging them.
The 11th score is 85
The 12th score is 86
The average of the two is 85.5
Hence the answer is 85.5
Answer:
the burgers be 3 and fries be 2
Step-by-step explanation:
The computation is shown below:
Let us assume burgers be x
And, the fries be y
Now according to the questiojn
1.25x + 0.50y = $4.75
1.50x + 0.99y = $6.48
Now multiply by 1.2 in the first equation
1.50x + 0.6y = $5.70
1.50x + 0.99y = $6.48
-0.39y = -0.78
y = 2
Now put the value of y in any of the above equation
1.25x + 0.50(2) = $4.75
x = 3
Hence, the burgers be 3 and fries be 2