A mango tree is mentioned so I would say a mango
That extreme kind of exaggeration in speech is the literary device known as hyperbole.
please tell us the name of the chapter
The question is incomplete and the complete form of the question is as expressed below.
A worker can clean a pool in four hours less time than it takes another worker. If men work together, the job takes 8/3 hours. How long would it take the slower man working alone?
<h3>What is the hour(s) that will take the slower man?</h3>
Taking x to be the hour(s) for the slower man and (x-4) be the number of hours for the faster man working separately. Thus,
1/x+1/(x-4)=1/8/3
1/x+1/(x-4)=3/8
[(x-4)+x]=(x)(x-4)(3/8)
2x-4=(x^2–4x)(3/8)
16x-32=3x^2–12x
3x^2–28x+32=0
<h3>Factorisation</h3>
Factorise to solve the value of x:
There are 2 values of x for the factors: (3x-4)(x-8) =0
- 3x - 4 =0; 3x= 4; x = 4/3 or 1 1/3 hours (invalid due to the fact that it fits not for the slower man who will work alone for 4 hours slower than the faster man as it is only 4/3 hours which is lesser than 4 hours.
- x - 8 = 0; x = 8 hours (answer to be adopted because it is fit for the slower man to do the job separately for 4 hours lesser than the faster man.
Verify:
1/8 + 1/(8–4) = 1/8/3 =3/8
1/8 + 1/4 = 3/8
(1+2)/8 = 3/8
3/8 = 3/8
Therefore, the correct answer is x = 8 hours for the slower man to work alone.
learn more about factorisation: brainly.com/question/25829061
#SPJ1
Answer:
It is a satellite that collects data about rain and snow.
Its orbit covers 90 percent of Earth’s surface.
The sensors measure microwaves.
Explanation: