Answer:
d
Step-by-step explanation:
took test and got it back right
I might get this wrong but 60 minus 45 equals 1515
Step-by-step explanation:
Answer: The required probability is 0.82.
Step-by-step explanation:
Since we have given that
Number of projects = 3
So, probability of getting each project =
Probability of first path being completed in 43 days = 0.7
Probability of second path being completed in 43 days = 0.85
Probability of third path being completed in 43 days = 0.90
So, Probability that the project will be completed on time would be
Hence, the required probability is 0.82.
Answer:
%37.5
Step-by-step explanation:
.375 aka %37.5
If we did .375 x 40 it would be 15. 40-15=25
Since all sides of a square are the same, the area of a square is one side squared.
Meaning if a square had a side of 4, the area would be 16 since 4 squared is equal to 16.
The opposite is to square root the area. If you calculate the square root of 16, you get 4.
In this situation, we have to square root "." We can split the area up into "25" and . The square root of 25 is 5, and the square root of x squared is just x. Multiply 5 and x together, you get 5x.
Easy as that, you get your answer!
5x