Answer:
a) 60
b) 0.24
c) 150
Step-by-step explanation:
a) P(green) = ⅕
Expected no. = 300 × ⅕
= 60
b) total = 300
P(purple) = 72/300
= 6/25 = 0.24
c) P(blue) = 45/300
= 3/20 = 0.15
Expected no.: 1000 × 0.15
= 150
Answer:
Unit rate miles per day is, 3
Step-by-step explanation:
Unit rate are defined as the rate are expressed as quantity of 1 such that 2 miles per hour or 5 km per hour.
As per the given statement: A construction crew built 1/2 miles of road in 1/6 days
by unit rate definition;
After substituting the given values we have
⇒
or
Therefore, unit rate miles per day is, 3
Step-by-step explanation:
hhhthhg
Answer:
3 down, 4 up
Step-by-step explanation:
-3 is the X line, which starts on 0, if you subtract 3, or add -3, you would have to go down, 3 down. 4 is on the Y line, so you add, go left to add on the Y line, 4 up.
Always start with you X coordinate. Here is a tip to help you (X, Y)
A quadratic function is one of the form f(x) = ax2 + bx + c, where a, b, and c are numbers with a not equal to zero. The graph of a quadratic function is a curve called a parabola. ... A parabola intersects its axis of symmetry at a point called the vertex of the parabola. You know that two points determine a line.
The wording of this question is a bit confusing... You can't write a sequence in sigma notation, but rather a series or sum. I think the question is asking you to write the sum of the sequence,

which would be

in sigma notation.
To do this, notice that the denominator in each term is a power of 2, starting with
and ending with
. So in sigma notation, this series is
