46.007 is the correct answer
Answer:
104
Step-by-step explanation:
390/15=26
26 times 4 is 104
Answer: both
Unless you mistyped the first number and it’s actually -3 instead of 3 than b is the answer.
To see if they make a function you can graph all the coordinates and do the line test. Or you can look at all the numbers and see if any of the ordered pair have repeating x values. If they do, it’s not a function.
Remember, it’s (x,y) and if any X values repeat, it’s NOT a function
Answer:
y=-1/2x+5
Step-by-step explanation:
5 is where the line crosses the y axis and the amount the slope goes down is -1/2
Answer: it will take 5.875 hours to move the remaining blocks
Step-by-step explanation:
It takes the construction company 3/4 hours to move move 12 rocks. It means that the time it will take them to move 1 rock is
(3/4)/12 = 0.75/12 = 0.0625 hour
Since the construction company has already moved 50 of the 144 rocks that need to be moved, then the number of blocks remaining to be moved is
144 - 50 = 94 blocks
Therefore, the time it will take them to move 94 blocks is
0.0625 × 94 = 5.875 hours