I think it’s 20d-$12
Hope this helps!
3/4
Step-by-step explanation:
If you cut a whole pie into two you get two (2) ½ pieces
1 ÷ 2 = ½
When you cut the two ½ pieces into two you get four (4) ¼ pieces;
½ ÷ 2 = ¼
When you cut the four ¼ pieces into two you get 8 1/8 pieces;
¼ ÷ 2 = ¹/8
Therefore the whole pie at this point is made up of 8 ¹/8 pieces. When two (2) of these pieces are eaten we are left with 6 ¹/8 pieces;
8 – 2 = 6
The portion of the pie left therefore is;
6 * ¹/8 pieces
= ⁶/8
= ³/4
Answer:
It will take the boulder approximately 4.28 seconds to hit the road
Step-by-step explanation:
The given height of the cliff from which the boulder falls, h = 90 feet
The equation that can be used to find the time it takes the boulder to fall is h = u·t + (1/2)·g·t²
Where;
h = The height of the cliff = 90 ft.
u = The initial velocity of the boulder = 0 m/s (The boulder is assumed to be at rest when it falls)
g - The acceleration due to gravity ≈ 9.81 m/s²
t = How long it will take for the boulder to hit the road below
Plugging in the values gives;
90 = 0 × t + (1/2)×9.81×t² = 4.905·t²
∴ t = √(90/4.905) ≈ 4.28
The time it takes the boulder to hit the road, t ≈ 4.28 seconds.
Answer:
c
Step-by-step explanation:
if y is equal to the amount of milk and 6000 gallons are made an hour then you have to multiply the amount of hours(x) by the 6000 gallons of milk made in 1 hour so y=6000x
Divide 1/2 by 1/8 by doing Keep change flip. 1/2 divided by 1/8 turns to 1/2 x 8/1 =9/2 and then divide 9/2 like this 9 divided by 2= 2 1/2