Answer:
1/4=25 minutes an hour
25×2=50
it will take him 50 minutes
Answer:
What do you need help with there is nothing here??
Step-by-step explanation:
Answer:
B. y= 2x–15
Step-by-step explanation:
The equation that represents the line that passes through the points (8, 1) and (10,5) is y= 2x–15
"x" is found on the left hand side of the bracket and "y" is found on the right hand side of the bracket :)
(8, 1) and (10, 5)
x in the first bracket is 8 and x in the second bracket is 10.
y in the first bracket is 1 and y in the second bracket is 5.
When this equation is applied to find the value for y we get:
y= 2x-15
y= 2(8)-15
y= 16-15
y= 1
y= 2x-15
y= 2(10)-15
y= 20-15
y= 5
We got back the values of y and this means that the equation was correctly chosen and the answer is correct :)
Um... it'll take each pipe 80 mins, bcz if together they take that long, then to find the pipes time separately, you just multiply it by two to show it doing the work the other pipe did as well. Is that what you wanted??
What do u mean by missing measurement?