1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
elixir [45]
3 years ago
15

With water from one hose, a swimming pool can be filled in 8 hours. A second, larger hose used alone can gill the pool in 6 hour

s. How long would it take to fill the pool if both hoses were used simultaneously?
Mathematics
1 answer:
nalin [4]3 years ago
7 0
So. the smaller hose, can fill the pool in 8hrs
in 1hr then, it really has done only 1/8 of the job

if we take the filled pool to be the total job time, or "t"
then the smaller hose in 1hr has only done only 1/8 in "t" amount or  \bf \cfrac{1}{8}t

now, the bigger hose, can do the filling in 6hrs
that means in 1hr, it has only done then 1/6 in "t" time or  \cfrac{1}{6}t

now, the whole job, is a whole, or 1

so.. let us add those rates of each  hose together, to see how long they'd take \bf \cfrac{1}{8}t+\cfrac{1}{6}t=1\implies \cfrac{t}{8}+\cfrac{t}{6}=1

solve for "t"
You might be interested in
The revenue for a company producing widgets is given by y = -20x2 - 50x + 200, where x is the price in dollars for each widget.
lisov135 [29]

Answer:

The  price is   x =  $2.779

Step-by-step explanation:

From the question we are told that

  The  revenue is  y = - 20x^2  - 50 x + 200

   The cost of production is  y = 30 x - 10

Generally at break even point the cost of production is equal to the  revenue

So

      -20x^2 -50x + 200 =  30x-10

=>   20x^2 +20 -210 = 0

Using the quadratic formula to solve this equation we have that

       x =  $2.779

     

6 0
3 years ago
Read 2 more answers
The Edward James Toy Company uses a Kanban system to make plastic wheels that are a component of several toys. The waiting time
pickupchik [31]

Answer:

N_c \approx 5.0

Step-by-step explanation:

From the question we are told that:

Waiting time for a container of the wheels during production T_w=0.25day

Average processing time is T_a=0.15 day per container

Wheel per container N_w=200

Total wheel per day D=2000

Policy variable of X=5%  

Generally the equation for Total number of container N_c is mathematically given by

N_c=DT(\frac{1+X}{N_w} )

Where

Total time T=T_w+T_a

T=0.15+0.25

Therefore

N_c=DT(\frac{1+X}{N_w} )

N_c=2000*0.40(\frac{1+0.5}{200} )

N_c=(\frac{840}{200} )

N_c=4.2

N_c \approx 5.0

Therefore the number of Kanban containers needed for the wheels is

N_c \approx 5.0

3 0
2 years ago
30 POINTS HELP ME-
Ray Of Light [21]

Answer:

Number line graph with closed circle on 30 and shading to the right

because you already have 30 dollars and they need at least 120 but if they get more then 120 they can still hold the science fair.

THIS ANSWER ISN'T MINE. I TOOK IT FROM AN ANSWER TO THE SAME QUESTION ANOTHER USER POSTED.

4 0
2 years ago
Read 2 more answers
16.27 rounded to the nearest hundredth
Verdich [7]

Answer:

16.27

Step-by-step explanation:

where is the thousands number need more details

5 0
3 years ago
a master roof can cover a garage in 1 hour less than her new assitant. if they work together, they can complete the job in 7.75
Art [367]
Idek i need to unlock sometin sooo
7 0
3 years ago
Other questions:
  • 3-x/4>2 plz help me!!!
    6·1 answer
  • A bag contains only red, green, brown and yellow marbles.
    13·1 answer
  • X+3=6,x=1<br><br> How do you do this
    10·2 answers
  • How many calculations can this computer preform in one minute?
    11·1 answer
  • HELP ME PLEASE ON THIS!!
    8·1 answer
  • Find the perimeter .<br>show your work
    13·1 answer
  • Help!!PLZ!!!ASAP!!!!!!!!!
    13·2 answers
  • 22 ft
    11·1 answer
  • Sally is taking a test
    13·2 answers
  • The sum of two numbers is 17
    11·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!