Answer:
T maximum=T average -7.8 seconds
T minimum=T average +7.8 seconds
Step-by-step explanation:
Calculation for the equation that can be
use to find the maximum and minimum times for the track team
Using this equation to find the maximum times for the track team
T maximum=T average -7.8 seconds
T maximum=64.6 seconds-7.8 seconds
Using this equation to find the minimum times for the the track team
T minimum=T average +7.8 seconds
T minimum=64.6 seconds +7.8 seconds
Therefore the equation for the maximum and minimum times for the track team are :
T maximum=T average -7.8 seconds
T minimum=T average +7.8 seconds
Answer:
60 tiles are used
Step-by-step explanation:
1m equals 100 cm.
5m equals 500
3m equals 300
the whole thing is 500 by 300 which when you multiply gives you
150,000. When you multiple 50 by 50 it gives you 2,500. So when you divide 150,000 by 2,500 it gives you a total of 60 tiles. HOPE THIS HELPS
Answer:
D. 10
Step-by-step explanation:
Since you divided by 2. You want to multiply to go back wards.
35×2=70
They already give you base(b=7) so to find the height you need to divide to go backwards since you multipled bh.
70÷7=10
now plug it in to see if the equation is right.
35= 1÷2 (7×10)
Answer:
In graph
Step-by-step explanation:
First put it in Slope -Intercept form.
then graph the y- intercept first.
After that it's rise over run so think 1/1
up 1 over one.
8% of 552 is 44.16. Look at the percent sign as a decimal and move it two places to the left, that'll give you 0.08. To find 8% of 552, look at it as 0.08 multiplied by 552. After you multiply you should get 44.16.