60 days / 8 workers = 7.5
60 days - 12 days of work done = 48
48 x 7.5 = 360
360/ 12 workers = 30 days to finish rest of the house.
136,668,528 is the answer I got I hope this helps
The cost would be 183 rupees
Because
= 3 ( 3 / 4 ) x 48 ( 4 / 5 )
= 183 rupees.
Answer:
80 pounds.
Step-by-step explanation:
Let W₁ be the initial weight of water in the grapefruit, W₂ be the weight of water in the grapefruit after evaporation, and M be the total weight of the grapefruit after evaporation. Assuming that, originally, the grapefruit weighed 100 pounds with a 92% water content and the weight of the "non-water" part of the fruit (100 - W₁) does not change. The final weight of the grapefruit (M) is given by: