Answer: A primary positive effect of the Columbian Exchange is increased food supply of both the Old World and the New World. Various crops such as wheat, barley, and rye, were introduced by Columbus and his followers.
Explanation:
Is this a multiple-choice question?
Any answer pointing towards an authoritarian system of government, i.e. socialism, communism, fascism, corporatism, anything of the like.
Answer:
Of the options provided "fast, cheap railroad transportation benefited is businesses" is the correct response.
Explanation:
The railroads made it possible to ship goods without having to use the canals and rivers that transportation relied upon previously in what is today the Midwestern and south central United States. It helped to reduce the time it took to transport goods across vast distances and it helped to lower costs. The railroads made the rapid settlement of the Midwest and the West Coast possible. Factories on the East Coast also benefited from the expansion of the railway system as raw materials could be shipped in at lower prices and in greater quantities. The products they produced could also be more efficiently sent to far-off locations for sale.
Most owners are familiar with this delivery method where each stage follows the others in a linear progression with no overlap. After securing the services of an architect, who reports directly to the owner, plans and specifications will be drafted, and then contractors will bid for the project. The lowest responsive, responsive bidder is awarded the project, which progress exactly as designed.
Advantages:
Being a familiar method, Competitive Bid projects are an easier sell, and they're easier to manage because the scopes and stages are rigidly defined. Because the design team and contractor both report to the owner, the owner has a greater degree of control over the process. As the name suggests, the bidding process typically results in the best price.
Disadvantages:
While the Competitive Bidding elicits low bids, the coast of a design is not determined until the bids are receieved. This could mean that a redesign is required if the bids exceed the budget, and because time is a financial factor, cost estimates can change during the design process. Th fragmented approach can also cause more finger-pointing between parities, since the contractor is not able to give advice during the design, budget, or project planning phases. Finally, the linear schedule makes this the slowest of the three methods