Answer:
x=4
Step-by-step explanation:
"A number" can be rewritten as X:
6x=3x+12
1) subtract 3x on both sides:
3x=12
2) divide both sides by 3:
x=4
I would say the best estimate would be 9 because the real answer is 8.71 and if you round that to the 1 place the answer would be 9.
Okay this is how I would figure this out:
I would take 9 divided by 3 and get 3, so he can tile abut 3 square ft. in 15 minutes.
Then, I would multiply 3 by 4 because there are 4 15 in an hour. I would get 12.
So it takes Jakob 1 hour to tile 12 square feet.
Your answer is: He can tile about 12 square feet per hour.
Hope this helped :)
Answer:
prime factorization of 28
28 = 2 × 2 × 7
prime factorization of 50
50 = 2 × 5 × 5
Step-by-step explanation:
GCF, multiply all the prime factors common to both numbers:
Therefore, GCF = 2
Answer:
The Slope= -13/3
y-intercept= (0,5/3)
Step-by-step explanation:
m= change in y/change in x
m= y2-y1/x2-x1
m=6-(-7)/ -1-(2)
m=-13/3