Answer:
3,8
Step-by-step explanation:
Answer:
318 days or 10.6 months,
No, because the time between august and december is 8 months and it would take 10 to complete the tunnel
Step-by-step explanation:
start by determining the slope:
subtract the remaining distance from the total distance to determine distance so far, then divide by time.
m = (3200 - 1700)/5
m = 1500/5
m = 300
y = mx + b
Plug in to solve for x.
3200 = 300x + 0
3200 = 300x
divide y by m. This is x. (this is known as inverse operation if you didnt know already.)
3200 = 300(10.6_)
That point does not satisfy either inequality.
You can tell it does not satisfy the first portion, due to it being under the shaded line. Secondly, the dotted line goes through it, but that fact that it is dotted makes it not included.
Answer:
11/5-1/2 = 22/10-5/10= 17/10 = 1 7/10
Step-by-step explanation:
The answer is 1 7/10
The answer is 266 but estimated is 260