Select the correct answer from each drop-down menu.

Mathematics
2 answers:
kirill [66]3 years ago
7 0

Answer:

x=90 degrees

y=142 degrees

z=128 degrees

Step-by-step explanation:


balu736 [363]3 years ago
7 0

Answer:

X = 95 degrees

Y = 147 degrees

Z = 128 degrees

Step-by-step explanation:

Angle z can be found as : 180-52 = 128 degrees. This is because the sum of the internal angle and the external angle on the same vertex is 180°

The opposite of angle X can be found as 180-(45+50) = 85 degrees.

Now angle X lies on the same line. We can say X is exterior angles to the opposite interior angle of bigger triangle.

Angle X = 180-85 = 95 degrees

An exterior angle of a triangle is equal to the sum of the opposite interior angles.

Angle Y = 52+95 = 147 degrees.

You might be interested in
Please Just two questions will 15 POINTS!!
Setler [38]
1. B and D

2.A

I hope this helped, woof.

8 0
4 years ago
Suppose that 5 workers can complete a certain task in 9 days. If there are 15 workers, how many days would
Marat540 [252]

Answer:

3 days would take the 15 workers to finish the same task

Step-by-step explanation:

  • In the questions of doing a job, the number of workers and the time are in an inverse proportional because if the number of workers is increased, then the time of finishing the job will decrease and vice versa
  • The relation between the number of workers and the time to finish any job is N × T = K, where, N is the number of workers, T is the time to finish the job, and K is constant

Let us use this relation to solve the question

∵ 5 workers can complete a certain task in 9 days

∴ N = 5 workers and T = 9 days

→ By using the relation above

∴ 5 × 9 = k ⇒ (1)

∵ If there are 15 workers will make the same task

∵ They can finish it in x days

∴ N = 15 workers and T = x days

→ By using the relation above

∴ 15 × x = k ⇒ (2)

∵ k is the same task, then equate the left sides of (1) and (2)

∴ 15 × x = 5 × 9

∴ 15x = 45

→ Divide both sides by 15 to find x

∴ x = 3 days

∴ 3 days would take the 15 workers to finish the same task

3 0
3 years ago
Which is the graph of y=3/4x-3
HACTEHA [7]

Graph A (the middle one)

6 0
4 years ago
Read 2 more answers
.35 times .7 pls show work.
Semenov [28]
Hereeeeeeeeeeeeeeeeeeeeeeee

3 0
3 years ago
Read 2 more answers
Is checking account an asset or liabilitie
photoshop1234 [79]
A checking account is a liability
7 0
3 years ago
Other questions:
  • Plz help now I am super confused and need help and the photo is included
    8·2 answers
  • Which number shows 857,632 rounded to the nearest hundred thousand?
    8·2 answers
  • W(x) = 4x - 1; Find (2)
    15·1 answer
  • A carpenter is framing a wall that is 8 feet high and 15 feet long. If the carpenter wants to be sure that the sides of the wall
    14·2 answers
  • What is the surface area of this net
    7·1 answer
  • 6 people shared 4 subs equally how much each get
    10·1 answer
  • Closing prices of two stocks are recorded for 50 trading days. The sample standard deviation of stock X is 4.665 and the sample
    14·1 answer
  • What is the solution to the following system of equations?
    13·1 answer
  • Complete the following questions. 4 x 5 - 45 ÷ 9 = (18 - 6) x (12 - 4) =
    5·2 answers
  • Can someone help me please
    9·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!