The answer is 7/10 because 3 1/2 divided by 5 = 7/10
Answer:
1/3
Use the slope formula and simply the fraction.
0.373 seconds. First, calculate the initial vertical velocity of the shell. 800sin(30) = 800*0.5 = 400 m/s Now the formula for the distance traveled is d = 400 m/s * T + 0.5A T^2 Substituting known values gives. 150 = 400 m/s * T + 0.5*9.80m/s^2 T^2 150 = 400 m/s * T + 4.9 m/s^2 T^2 Arrange as a quadratic formula 0 = 400 m/s * T + 4.9 m/s^2 T^2 - 150 4.9 m/s^2 T^2 + 400 m/s * T - 150 = 0 Now solve for T using the quadratic formula with a=4.9, b=400, and c=-150 The calculated value is 0.373 seconds. Is this value reasonable? Let's check. The initial downward velocity is 400 m/s. So 150/400 = 0.375 seconds. Since the actual time will be a bit less due to acceleration by gravity and since the total time is so short, there won't be much acceleration due to gravity, the value of 0.373 is quite reasonable.
The monthly interest rate is 0.75%
<u>Step-by-step explanation:</u>
The rate of interest= 9%
Total time = 6years
Interest rate per month = 9/12
= 0.75%
Monthly payment =cost of the car + 0.75% of cost of car
Interest per month is 0.75%
Answer:
y = - 3x - 1
Step-by-step explanation:
the equation of a line in slope- intercept form is
y = mx + c ( m is the slope and c the y- intercept )
calculate m using the slope formula
m =
with (x₁, y₁ ) = (- 1, 2) and (x₂, y₂ ) = (0, - 1)
m = = = = - 3
the line crosses the y- axis at (0, - 1 ) ⇒ c = - 1
y = - 3x - 1 ← equation of line