Answer:
variable cost per unit = 46
fixed cost 188680
Explanation:
The high-low method consist in compare each frame to get the variable and fixed components
5440 high
2040 low
3400 difference
437920 high
281520 low
156400 difference
variable cost =15600/3400
variable cost = 46
the reasoning is that the additional 3400 units generated that cost.
Now:
we múltiple by the units by the production and get total variable
46 * 2040 = 93840 total variable
lastly total cost - total variable = fixed
281520 - 93840 = 188680
He’s not even lost or missing he probably ghosted you please stop sharing this and move on
Answer:
$172.25
Explanation:
initial outlay for the project = -$350
cash flow years 1-5 = [($300 - $135 - $70) x (1 - 36%)] + $70 (depreciation expense) = $60.80 + $70 = $130.80
using an excel spreadsheet and the NPV function, we can calculate the project's NPV with an 8% discount rate:
=NPV(8%,130.80,130.80,130.80,130.80,130.80) - $350 = $522.25 - $350 = $172.25
we can also do it manually:
NPV = -$350 + $130.80/1.08 + $130.80/1.08² + $130.80/1.08³ + $130.80/1.08⁴ + $130.80/1.08⁵ = $172.25
Answer:
Project Y = -$1,825.80
Project Z = $4,148.00
Explanation:
Calculation are as attached in the file