Answer:
The risk consequence of both activities is 1.6 months.
Step-by-step explanation:
We can define a randome variable D: total delay time for the project, and calculate its expected value.
This would be the risk consequence of both activities.
The expected delay time for the project is the sum of the expected delay for task A plus the expected delay for task B. It is assumed the likelihood of a problem in any task is independent of the other.
Then, each expected delay for a task is equal to the probability of a problem multiplied by the consequence (delay time).

The risk consequence of both activities is 1.6 months.
Jajwhwbbxncnnsjwkosxjcnxbdb sorry i need points
The answer is D. The +1 refers to the extra cup leftover from a previous bag. X represents how many cups are in each bag, and that is what you need to know. The three represents how many bags she bought, and the 25 represents how many cups of birdseed she had overall.
Hopefully this helps!
No. They are all repeating except for 3/12 (0.25), 6/12 (0.5), 9/12 (0.75), and 12/12 (1). To find the decimal of each fraction, simply plug each of them into the calculator as a division problem.
Ex: 1÷12, 2÷12, and so on.