Answer:
htjjtjtjjtntnjtjjjjttkrkrkrkdkrk
Answer:
P = 0.05
Step-by-step explanation:
12 months * 30 days each = 360 days
From 306 days, we have to select 8 days = 360C8 ways(Total ways)
We want each days from different month. First, we have to select 8 month from 12 month = 12C8 ways
---By selecting 8 month, we will select a days from each month. That can be done in = 30C1 * 30C1 * .................30C1 (8 ways) [From a month with 30 days, we can select a day in 30C1 ways = 30 ways]
Therefore P = Number of ways of selecting each days from different month / Total number of ways
P = 12C8 * 30^8 / 360C8
P = 495 * 656100000000 / 6469697679132645
P = 0.0501985588982791
P = 0.05
Hence the probability that each day is from a different month is 0.05
I assume that this 'something' has a rectangular shape. If its width is 5m, than the length of two sides is 2 * 5 = 10m. Now if the perimeter is 22 square meters, then the lenght of another two sides is 12 / 2 = 6.
12 because 22 (the perimeter) - 10 (lenght of the 2 sides) = 12 (length of another 2 sides).
P(A) = 0.993 is the probability of event A
_
P(A) is the probability of not A (note that I am trying to place a bar over A. I hope you can see it, else it is because the editor did not show it as I intended)
Then, use the fact that the probability of A plus the probability not A is equal to 1:
_
=> P(A) + P(A) = 1
_
=> P(A) = 1 - P(A) = 1 - 0.993 = 0.007
So, the answers are:
_
1) P(A) = 0.07
_
2) Yes, A is unlikely because its probability is very low.