Answer:
$270,000
Step-by-step explanation:
First, find the area of the plot using the formula A = lw
A = lw
A = (300)(150)
A = 45,000
Then, multiply this by 6 to find the total cost:
45,000(6)
= 270,000
So, the cost to tile the plot is $270,000
Answer:
slope=1
Step-by-step explanation:
because slope=-A/B
slope= -2/-2
slope =1
Well if we look at it this way, 12 divided by 4 equals 3 and 3 times 5 equals 15, so 1 cup divided in to four is one fourth cup. So your Answer is one fourth a cup.
ANSWER 1/4 Cup
Answer:
3. Option 2 (Perpendicular)
4. Option 3 (neither)
Step-by-step explanation:
3.
m1 = -7/8
Second equation: -8x + 7y = -21
7y = 8x - 21 y = (8/7)x - 3
m2 = 8/7
m1 & m2 are not equal, so not parallel
Since m1×m2 = (-7/8)(8/7) = -1,
They are Perpendicular
4.
m1 = -1/4
Second equation: -2x + 8y = 6
8y = 2x + 6 y = (1/4)x + 3/4
m2 = 1/4
m1 & m2 are not equal, so not parallel
Since m1×m2 = (-1/4)(1/4) = -1/16, not -1. They are not Perpendicular either. So, neither