Answer:
n=-N/5+9/5
Step-by-step explanation:
.4 × 2.5 = 1. product means multiply / sum would be addition
Answer:
alright so 1 and 2 are equal to each other because there congruent angles. When angkes are congruent to each other or in other words the opposite to each other there equal.
Answer:
So to maximize profit 24 downhill and 20 cross country shouldbe produced
Step-by-step explanation:
Let X be the number of downhill skis and Y the number of cross country skis.
Time required for manufacturing and finishing each ski are: manufacturing time per ski, downhill 2.5 hours, cross country 1.5 hours
Finishing time per ski: downhill 0.5 hours, cross country 1.5 hours.
Total manufacturing time taken = (2.5) x+ (1.5+) y = 2.5x+1.5y≤90
total finishing time taken = 0.5x+1.5 y≤42
Profit function
Z = 50x+50y
Objective is to maximize Z
Solving the two equations we get intersecting point is
(x,y) = (24,20)
In the feasible region corner points are (0.28) (36,0)
Profit for these points are
i) 2200 for (24,20)
ii) 1400 for (0,28)
iii) 1800 for (36,0)
So to maximize profit 24 downhill and 20 cross country shouldbe produced.
Answer:
2³ x 3²
Step-by-step explanation:
The prime factorization of a number is the process of breaking down a number to a set of prime numbers that their product will give the original number:
72
2 x 36
2 x 2 x 18
2 x 2 x 2 x 9
2 x 2 x 2 x 3 x 3
So;
The prime factorization is 2³ x 3²