Variable costs are costs that change as the quantity of the good or service that a business produces changes.
Answer:
5 12/25
Step-by-step explanation:
The first step is to separate the whole number number from the decimal.
that would be 5
Next would to see in which place the decimal number is in. .48 is in the hundredths place so we put 48 over 100 like this 48/100
So now we have the whole number 5 and the fraction 48/100
Lastly we simplify the fraction. 48 divided by 2 and 100 divided by 2
This equals 24/50
This can be simplified even more
24 divided by 2 and 50 divided by 2
This equals 12/25
Then we put the whole number in front and your final answer is
5 12/25
F(3)=-18
You just replace x for three for your equation and then use Ofer of operations to solve it.
So f(3)= 21+ 2(3)-5(3)^2
The exponent goes first: f(3)= 21+ 2(3)-5(9)
Next is multiplication: f(3)= 21+ 6-45
Now add: f(3)= 27-45
Finally subtract: f(3)= -18
Hope this helps!
Length in feet multiplied by width in feet multiplied by height in feet divided by 27 equals cubic yards needed.
When dealing in inches: convert inches to feet by dividing by 12.
For example: pour a 25 ft. sidewalk 5 ft. wide and four inches deep.
(25’ x 5 ‘ x 0.333’) / 27 = 1.54 cubic yards
Note* we achieved 0.333 ft. by taking four inches and dividing by twelve.
Another example: yardage for an 80 ft. driveway, 24 ft. wide and 5 inches deep.
(80’ x 24’ x 0.416’) / 27 = 29.58 cubic yards
Answer:
ok ill answer it 365,000,1