Check the picture below, that's just an example of a parabola opening upwards.
so the cost equation C(b), which is a quadratic with a positive leading term's coefficient, has the graph of a parabola like the one in the picture, so the cost goes down and down and down, reaches the vertex or namely the minimum, and then goes back up.
bearing in mind that the quantity will be on the x-axis and the cost amount is over the y-axis, what are the coordinates of the vertex of this parabola? namely, at what cost for how many bats?

![\bf \left( -\cfrac{-7.2}{2(0.06)}~~,~~390-\cfrac{(-7.2)^2}{4(0.06)} \right)\implies (60~~,~~390-216) \\\\[-0.35em] \rule{34em}{0.25pt}\\\\ ~\hfill (\stackrel{\textit{number of bats}}{60}~~,~~\stackrel{\textit{total cost}}{174})~\hfill](https://tex.z-dn.net/?f=%5Cbf%20%5Cleft%28%20-%5Ccfrac%7B-7.2%7D%7B2%280.06%29%7D~~%2C~~390-%5Ccfrac%7B%28-7.2%29%5E2%7D%7B4%280.06%29%7D%20%5Cright%29%5Cimplies%20%2860~~%2C~~390-216%29%20%5C%5C%5C%5C%5B-0.35em%5D%20%5Crule%7B34em%7D%7B0.25pt%7D%5C%5C%5C%5C%20~%5Chfill%20%28%5Cstackrel%7B%5Ctextit%7Bnumber%20of%20bats%7D%7D%7B60%7D~~%2C~~%5Cstackrel%7B%5Ctextit%7Btotal%20cost%7D%7D%7B174%7D%29~%5Chfill)
Answer:
A. 183 meters
Step-by-step explanation:
Building A and building B are 500 meters apart. There is no road between them, so to drive from building A to building B, it is necessary to first drive to building C and then to building B. About how much farther is it to drive than to walk directly from building A to building B? Round to the nearest whole number. A) 183 meters B) 250 meters C) 366 meters D) 683 meters
Find distance BC
Cos (60°)=BC / AB (Adjacent divided by the hypotenuse)
Cos (60°)=1/2
BC=a
AB=500
Cos (60°)=BC / AB
1/2=a/500
1/2 * 500=a
250=a
a=250m
Find distance AC
Sin(60°)=AC/AB (opposite side divided by hypotenuse)
Sin(60°)=√3/2
AC=b
AB=500
Sin(60°)=AC/AB
√3/2=b/500
√3/2 * 500=b
250√3=b
b=433m
Distance AC and BC=AC+BC
433m+250m=683m
Subtract the distance AB from AC+BC
= 683m - 500m
=183m
Answer is A. 183 meters
Step-by-step explanation:
Domain -5 range 5 ,...............
You find the rates of each computer on its own...
One does the job in 55 minutes which we can say is 1/55
The other has a rate of 1/45.
The question wants to know how long it would take both working simultaneously to complete the job...
t/55+t/45=1
(9t+11t)/495=1
20t=495
t=24.75 minutes (24:15)
Answer:
undefined/no solution
Step-by-step explanation:
you use elimination to solve. So multiply 2x+4y=-12 by 1 and x+2y=-2 by 2. then you subtract 2x+4y=-12 by 2x+4y=-4 and get 0y=-8. Anything divided by 0 is undefined/no solution because you can't divide anything by 0.