Answer:
3.88 i believe
Step-by-step explanation:
Answer:
92% Confidence Interval = [8.515, 8.605]
Step-by-step explanation:
The number of samples given is 15,this less than 30, hence, we use the t score confidence Interval
= Mean ± t score × Standard deviation/√n
Mean = 8.56 ounces
Standard deviation = 0.09 ounces
n = 15
We find the degrees of freedom = n - 1
= 15 - 1 = 14
Using the T score table
T score for 92% confidence interval with degrees of freedom 14
= 1.8875
Hence:
Confidence Interval =
= 8.56 ± 1.8875 × 0.09/√15
= 8.56 ± 0.0454010035
Confidence Interval
8.56 - 0.0454010035
= 8.5145989965
≈ 8.515
8.56 + 0.0454010035
= 8.6054010035
≈ 8.605
92% Confidence Interval = [8.515, 8.605]
Answer:
6 hours
Step-by-step explanation:
Let the total work be X
Combined speed: X/2
Ron's speed: X/3
Harry's speed: S
X/2 = X/3 + S
S = X/2 - X/3 = (3X - 2X)/6 = X/6
Harry's speed is X/6, so he'll take 6 hours
To solve the problem we use the compound formula given by:
A=p(1+r/100)^n
where:
A=future amount:
p=principle
r=rate
A=1000000, r=11.6%, n=40
plugging the value in the formula we get:
1000000=p(1+11.6/100)^40
solving for p we get:
1000000=80.6432p
p=12400.300
rounding to the nearest 1000 we get
p=$12000
Answer:
<span>A.) 12,000</span>
Answer:
Lineal.
Step-by-step explanation:
To determine if the sequence 4,10,20,34,52 ....... is a linear model, a quadratic model or a cubic model, the following mathematical logical reasoning must be carried out:
4 to 10 = +6
10 to 20 = +10
20 to 34 = +14
34 to 52 = +18
Thus, we can see at a glance that the sequence increases 4 numbers in each digit, adding first 6, then 10, then 14 and so on, with which the next numbers in that sequence should be 74 (+22), 100 ( +26), 130 (+30), 164 (+34), and so on.
Therefore, since there is no quadratic or cubic relationship, the sequence is linear.